Drawn up some ideas for a new track. It will be built on a 4x2m table. I'm looking to have a fairly steep climb through the centre then falling gradually over the bridge to the short straight leading into the main straight. The second track was the original concept. It contains a kickback in the middle of the climb and LC's on the corners but others have suggested this would not flow as well.
I'm also looking to move the pit entry to the short straight before the main straight, but with the changing radius curve am stuggling to come up with the combination of curves necessary to achieve this
Thoughts and suggestions appreciated





















