Not that I am a brain surgeon or anything, but I successfully uploaded some photos in one of Aposs's topics about a track lifting system. I am not that far into my new track construction but thought I would share a few pics and keep you up to date with progress.
The track will be a 4 lane ninco digital system run by a d3800 PSU. I have been keeping an eye on some of the mods on the ninco unit that has very recently been undertaken by a fellow aussie and will hopefully be able to do some simiar mods.
The track is permanent and sits on a 4.8 x 2.4m table. The track hoists up into the shed roof using steel wire, some pullies and two boat winches.
Thats about it for now I guess. I am in Perth (WA) just in case anyone is wanting to have a look if setting up something similar. I am still waiting for a few items to arrive (Ordered from Armchair Racer and recommend buying through them)... Two double lane changes and a multi-lane sensor are in the post and should arrive soon). The double lane changers will be positioned side by side just before the end of the main straight to allow cars to mix it up a bit off the start line (hopefully not too much carnage!!!)
Anyhow, hope you enjoy the photos (below).
Dave











































